InvestorsHub Logo
icon url

Saving Grace

03/17/22 11:09 AM

#12438 RE: bigblockwyz #12424

I understand shorts were pinched and a warning that with Eric Sprott now involved, the big squeeze is yet to come.

IO miner Cleveland Cliffs bought out two steel makers, AK Steel and Arcellor Mittal for far less than the 1.2billion for both steel firms, that you said will cost for a simple processing plant.

I just laughed at the nonsense posted as ridiculous.

Real miners and investor Eric Sprott know the difference of a great investment and shorts falling short with excuses.

AMC and Sprott wouldn't even be here if it wasn't going to pan out for a healthy sum.

This is just the beginning of a healthy and beautiful, long term marriage.

Look at this as a warning to shorts as the next squeeze will bankrupt the hedge funds. They had better be on the right side of the coin if they want relief from their bad trading moves. As when the coming gold and silver volume is reported with their assumed rhodium discovery, it's over for short selling and why Eric Sprott is here.



icon url

Saving Grace

03/17/22 2:00 PM

#12475 RE: bigblockwyz #12424

New double 5-column Carbon Column Gold Recovery system for Hycroft Mine in Winnemucca, Nevada was designed by Leavitt & Associates Engineers, Inc. and supplied on a fast-tracked schedule. The CIC was designed in December, fabricated in January and installed and started up in February. Yanke Machine Shop fabricated and installed the system. The building permit was secured in 3 days due to experienced guidance from Leavitt & Associates and excellent service from Humboldt County Building Department. Bobby Thomas, Humboldt County Building Official stated, “We like the layout of the calculations and drawings submitted by Leavitt & Associates.”

The system was designed for 2500 gallons per minute. By June, due to process needs the plant was operating at a record 3300 gallons per minute. In July the mine decided to double the capacity by dividing the dual 5-column CIC into dual 2-column and 3-column systems. Foundations were poured, two support platforms were fabricated, Derrick screens were installed, new stair access was provided and piping modifications were completed. Again, on a fast-tracked schedule the CIC additions and modifications from design to installation were completed within a short 2 week period. Mine personnel were amazed and pleased with the speedy installation of facility modifications.



Was designed by Leavitt & Associates Engineers, Inc. and supplied on a fast-tracked schedule.

Leavitt & Associates Engineers, Inc.



https://www.leavittengineers.com/hycroft%20Mine%20Carbon%20Columns.htm