InvestorsHub Logo

Jacobi999

01/31/22 11:35 AM

#23229 RE: DD_Checker #23227

This is already looking bullish for the oil market as crude oil price projections soar up to $100 per barrel. Right now is $87 $AGYP
https://oilprice.com/oil-price-charts/

Jacobi999

01/31/22 11:37 AM

#23231 RE: DD_Checker #23227

$AGYP continues to consistently update its shareholders

RECAP of $AGYP 2022 OUTLOOK :

1) GILMER LEASE
Initial production data indicates that the pumping set up was insufficient to move the amount of fluids required using the gas bleed from the Wells. The current pump set-up yielded between 160 and 300 barrels of total fluids per day; however, the company discerned to achieve maximum potential at the Mississippi formation a pump setup that attains 1000 barrels of fluid per day, per well is required. The wells were showing between 2% to 5% oil cut even with these low pumping volumes.

Allied is currently in discussions with Tri-County to schedule installation for a 3- phase/200 amp service to the Gilmer Lease in Q1. As soon as electrical power is installed Allied will set an electrical submersible pump (ESP) in one of the wells to handle 1500 barrels of fluid per day. Allied will pump the well down and assess the data over a period of 60 days. Based on the results, we will repeat the process on each well until the lease is fully operational.

2) GREEN LEASE
In the coming weeks once the assessment of Well M-1 is complete, Allied will install the second ESP on Well X-3. Based on the success of Wells M-1 and X-3, Allied plans to evaluate three other Wells of interest at the Green Lease site. After achieving favorable production numbers over a 5-6 month period, Allied will plan a 3D seismic survey of the site to identify additional drilling targets.

3) PROMETHEUS LEASE
Prometheus Well 1H continues to pump as Allied refines the processes to maximize the potential of Well 1H. In order to improve the oil production from Well 1H, Allied is currently in the process of installing a transfer pump and will flare all the gas to reduce the pressure in the well. Accomplishing this will result in an increase in oil production for the well. Since the start of Q1, there have been continued oil sales from Well 1H as we look forward to seeing continued growth in numbers from this site.

H4nS0n

01/31/22 11:38 AM

#23234 RE: DD_Checker #23227

Progressing well on $AGYP three sites – Green Lease, Prometheus Lease, and Gilmer Lease – AGYP could see an increase in its share value as it continues production.

RECAP of $AGYP 2022 OUTLOOK :

1) GILMER LEASE
Initial production data indicates that the pumping set up was insufficient to move the amount of fluids required using the gas bleed from the Wells. The current pump set-up yielded between 160 and 300 barrels of total fluids per day; however, the company discerned to achieve maximum potential at the Mississippi formation a pump setup that attains 1000 barrels of fluid per day, per well is required. The wells were showing between 2% to 5% oil cut even with these low pumping volumes.

Allied is currently in discussions with Tri-County to schedule installation for a 3- phase/200 amp service to the Gilmer Lease in Q1. As soon as electrical power is installed Allied will set an electrical submersible pump (ESP) in one of the wells to handle 1500 barrels of fluid per day. Allied will pump the well down and assess the data over a period of 60 days. Based on the results, we will repeat the process on each well until the lease is fully operational.

2) GREEN LEASE
In the coming weeks once the assessment of Well M-1 is complete, Allied will install the second ESP on Well X-3. Based on the success of Wells M-1 and X-3, Allied plans to evaluate three other Wells of interest at the Green Lease site. After achieving favorable production numbers over a 5-6 month period, Allied will plan a 3D seismic survey of the site to identify additional drilling targets.

3) PROMETHEUS LEASE
Prometheus Well 1H continues to pump as Allied refines the processes to maximize the potential of Well 1H. In order to improve the oil production from Well 1H, Allied is currently in the process of installing a transfer pump and will flare all the gas to reduce the pressure in the well. Accomplishing this will result in an increase in oil production for the well. Since the start of Q1, there have been continued oil sales from Well 1H as we look forward to seeing continued growth in numbers from this site.