InvestorsHub Logo
icon url

mr_sano

12/12/21 12:01 PM

#51952 RE: ZUPS #51951

The rig shorted out as soon as they increased the current flow so I doubt they ever pressurized the vessel to operating levels. It matters little they have a far better chance with Taos Tornado walls than pitching this poor interpretation of joule heating.
icon url

zerosnoop

12/12/21 9:31 PM

#51953 RE: ZUPS #51951

I would say so as per the FACTS from the latest PR below. The original development partner is back involved, so they must be impressed.

https://ir.qsenergy.com/press-releases/detail/2056


QS ENERGY, INC., AOT UPDATE

Recent AOT testing confirms successful development path


CARSON CITY, NV / ACCESSWIRE / December 10, 2021 / QS Energy, Inc. (the "Company" or "QS Energy") (OTCQB:QSEP), a developer of integrated technology solutions for the energy industry, today provided an update to recent AOT testing.

Since reporting our findings on October 7, 2021, we have been able to positively confirm and correct 80% of what we have determined thus far to be the necessary improvements for a reliable and field worthy AOT. Based on the results of the recent component testing, we were able to rework the original grid pack, achieve high voltage in air and oil to verify that the individual components worked when assembled. As previously explained, the reason for component testing is to reveal a potential problem that could be otherwise concealed with a fully assembled AOT.

Based on the confirmation of these most recent and positive results using the fully assembled AOT, a medium gravity pipeline spec oil (API 23) was procured and pumped into the AOT. We ran the AOT with the reworked original grid pack for an hour at 10 kV and saw no anomalies and no short circuits, confirming our belief that the short condition was a result of failed insulation. We were then able to apply 20 kV to the oil despite utilizing a reworked original grid pack. This high voltage result seems to demonstrate that we have solved the problems reported in June of 2020. Subsequent testing in the laboratory showed the oil (API 23) would support a voltage of 40 kV. Between the laboratory data and issues found during recent component testing we are in the process of confirming the final design criteria for a new grid pack which represents the remaining 20% necessary for full treatment effect.

At this point, we have reopened discussions with our original development partner as well as reaching out to others. While we have tested with a representative oil sample, the next step is to test a development partner's actual pipeline oil as a prelude to another field test.