Yes, funds well spent on engineer Gallagher to get the PROVEN AOT working as advertised
we have been able to positively confirm and correct 80% of what we have determined thus far to be the necessary improvements for a reliable and field worthy AOT.
Based on the results of the recent component testing, we were able to rework the original grid pack, achieve high voltage in air and oil to verify that the individual components worked when assembled.