Allied began executing the plan to bring the Prometheus Well 1H back online. When Prometheus Well 1H was originally tested and submitted to the Texas railroad commission by Apache Corporation in 2014 their report showed 335 barrels of production per day along with 298,000 cubic feet of natural gas per day with 2557 barrels of flow back and formation water. (For more details about the Prometheus lease please see https://finance.yahoo.com/news/allied-energy-acquires-prometheus-lease-130000471.html)