Yes this is correct every trader has a right to his own trade destiny! PCTL I see a very bright future with the addition of O&G that will be generating exponential revenue QTR over QTR going forward!

Maverick Energy Services – PCT LTD. Catholyte – Grassy Creek Oilfield, Waterflood Improvement Project, Vernon County, MO

PCT Ltd. is working with Maverick Energy Services in Vernon County, Missouri, to use a unique electrochemically produced catholyte to enhance the injectivity, sweep efficiency, and oil production in a modified seven-spot well pattern. This seven-spot pattern #2A is a part of the larger Grassy Creek Oilfield where all seven wells are situated in the eastern part of the field and are closely spaced making them ideal for a field pilot test. These particular wells have not been treated other than by traditional waterflood. (Other wells in Grassy Creek were treated with a steam flood and a surfactant with limited success.) The pay thickness is between 20 and 25 feet for the lower Bluejacket SS and up to 80 feet in the Warner SS. The porosity in the Bluejacket is between 14-16% and 21-24% in the Warner. The permeability is between 20 and 40 md in Bluejacket and between 118 and 687 md (avg. 350 md) in the Warner. The crude oil is moderate to low gravity (19-29 degrees API), and reservoir temperatures average approximately 90 degrees F. The catholyte is produced onsite from special electroionizing process machinery using clean brine water. It can produce up to 700 gallons per day of 600-700 pm and 600-900 ORP catholyte. Storage is provided for up to 2000 gallons onsite, and a distribution line and pump is tied directly to the 2A seven-spot well injection well(s).

The project is using catholyte which has been initiated with Maverick Energy Services by designing up to an initial 30-day trial using varying volumes of the catholyte. The trial is being preceded by doing production and injection testing with fluorescent tracers on the two injectors (Warner and Bluejacket zones) as well as production tests on wells 2-1 through 2-6 to establish a baseline injection/production rate and pressure (if any since in the past some have gone on a vacuum), and monitoring every 4 hours for two to three days for tracer at each producer.

Finishing touches on PCT Catholyte delivery system


https://www.para-con.com/2021-02-04-grassy-creek-overview.php