Drilling extends mineralization to 730m strike below-surface within 970m of strike indicated through surface trenching. Deepest intersection to date of 4.83 g/t Au/1.5m down-hole at 225m below surface in hole GC20-02. First of seven in-fill definition drill holes yields up to 5.80 g/t Au over 0.7m. Four parallel gold-mineralized structures are intercepted in hole GC20-10.