Aurora was delayed... was supposed to be late 2021. The GPU was an INTC 7nm product, so with the slip in 7nm the Aurora slipped into 2022. I think the last information is the GPU will now be manufactured on TSMC 6nm. I think this means AMD will be the first with an Exascale supercomputer. Alan