#50181 RE: SoxFan #50170

Prior to shipping the equipment, our engineers conducted high voltage impedance testing on the grid pack, the blind flange, and the assembly to verify that the modified design and new insulating materials are performing as expected. All tests yielded good results with higher insulation values recorded than those measured in previous tests. We believe this is the result of the reliability engineering changes that were implemented during the rebuild process.