Not sure if Mexus is claiming they are catching 100% of the gold in the ores, which, of course, is an impossibility.....the best operations would be pretty happy with 80%.
Or, if they are claiming they are catching 100% of the gold in solution. That too is not really feasible, although probably closer to being achievable.
As usual, a PR that is poorly worded, hard to believe, and not backed up by anything. Where's the technical report? Where's the CEO's telecon that was promised? The 3-D Model? Anything....? Surely Lemas had some time while the mine was shut down to put that drill data into a simple modeling program?
And yeah, this PR probably precedes a convertible note.