There have been pictures throughout the process. Go to the Twitter account and you will see these. It is not an empty warehouse. There is work in progress and its close to completion.

icon url

powerbattles

01/28/20 9:14 AM

#29731 RE: Hugie #29726

$20M state of the art 50k SF waste to energy recycling power plant processing 70 ton per day of medical waste and generate 1.8 MW is nearing its completion

Power generation engines that will be producing 4.8MW at full capacity ready with our red and blue colors


a lot of the equipment has arrived...




Pictures from their Medical Recycling facility, about 20 million dollars facility













Watch this video: Inner lining for our waste to energy system. Look at the facility 48,167 SQ FT... HUGE boiler Blue color in the front...

https://www.instagram.com/p/Bz-j8b_nL3L/?igshid=65wgi8aagqw4

New roof delivered for installation at our facility



2500 sq ft office near finnish!