01/27/20 5:42 PM

#49492 RE: mr_sano #49491

Non-disclosure is the best device used to keep everyone in the dark. Remember when the first AOT was installed and we got pictures from a stockholder that it actually was installed and we knew where it was and who the client was? Now I suspect some doubt any of this is true. How many electrical issues will they have? Doesn't bode well for the crack engineering team.

zerosnoop

01/27/20 9:21 PM

#49493 RE: mr_sano #49491

Testing should resume quickly as per the FACTS below. The original AOT grid pack is on site & ready to be installed.

https://www.qsenergy.com/updates

It should be noted that despite the apparent electrical short circuit, tests performed during commissioning indicate the new high-capacity power supply is operating as designed.

Our engineers have prepared a plan to remove, test and visually inspect all components of the modified AOT grid pack. Subject to weather and resource availability (i.e. manpower, crane, etc.), we will use best efforts to remove, test and inspect of the modified AOT grid pack next week. In parallel, we plan to inspect and test the original AOT grid pack (shown in the attached image) which is currently being stored at the demonstration site and should be available for operation subject to inspection and test results.

We believe the best course of action may be to run our next full system test utilizing the original AOT grid pack as this grid pack has been successfully installed without incurring damage and has operated at normal pipeline flow rates under limited test conditions as described in our September 13, 2019 press release. Data collected in these limited tests indicate the original AOT grid pack powered by the new high-capacity power supply could provide significant flow rate improvement.