zerosnoop

01/25/20 7:00 AM

#49479 RE: mr_sano #49478

That's standard precautionary statements to protect the company, similar to the company running out of cash argument for 20 years ha ha.

LATEST UPDATES AND INFORMATION

Some of the statements on this web page may constitute forward-looking statements under federal securities laws. Please visit the following link for our complete cautionary forward-looking statement: https://www.qsenergy.com/site-info/disclaimer. You should read all updates and press releases in the context of our SEC filings, including our Form 10K filing of April 1, 2019, which can be accessed on our website and at https://ir.qsenergy.com/annual-reports. All updates on this web page are intended as general summaries, current as-of the referenced date. For full context, we urge you to read all referenced updates and press releases.












zerosnoop

01/25/20 7:04 AM

#49480 RE: mr_sano #49478

Testing should resume quickly as per the FACTS below. The original AOT grid pack is on site & ready to be installed.

https://www.qsenergy.com/updates

It should be noted that despite the apparent electrical short circuit, tests performed during commissioning indicate the new high-capacity power supply is operating as designed.

Our engineers have prepared a plan to remove, test and visually inspect all components of the modified AOT grid pack. Subject to weather and resource availability (i.e. manpower, crane, etc.), we will use best efforts to remove, test and inspect of the modified AOT grid pack next week. In parallel, we plan to inspect and test the original AOT grid pack (shown in the attached image) which is currently being stored at the demonstration site and should be available for operation subject to inspection and test results.

We believe the best course of action may be to run our next full system test utilizing the original AOT grid pack as this grid pack has been successfully installed without incurring damage and has operated at normal pipeline flow rates under limited test conditions as described in our September 13, 2019 press release. Data collected in these limited tests indicate the original AOT grid pack powered by the new high-capacity power supply could provide significant flow rate improvement.
















DCorleone

01/25/20 9:25 AM

#49481 RE: mr_sano #49478

Makes it obvious why QSEP CEO has to pay to play now. Over Half a Million dollars for the AOT Smoke and Mirrors show.