Most of the work already finish. The last stage is the office and that is about to finish as well. Expected to launch end of the year or Jan next year.
48,167 SF FACILITY - 20 MILLION DOLLARS MEDICAL RECYCLING PLANT IS NEARING ITS COMPLETION.

GRANT ACCESS TO INSTALL A WASTE TO ENERGY RECYCLING FACILITY IS FOR REAL!

Applicant/Owner: Medrecycler - RI Inc.
Location: 1600 Division Road

The applicant is proposing to install a waste to energy recycling facility in an existing building located at
1600 Division Road in a Commercial Industrial (CI) zoning district in accordance with Zoning Section 5.21“Green, renewable or alternative energy installations and facilities

https://www.westwarwickri.org/index.asp?keyword=medrecycler&searchSection=&SEC=%7BEEB5C3F2-7759-496A-8C17-C7EF17890170%7D&Type=SEARCH

Click on the link above or View the PDF doc here:
https://www.westwarwickri.org/vertical/sites/%7B7B7C7E47-F7C1-4511-8CF3-EA8EBAF7D539%7D/uploads/Agenda_050619.pdf

Contractor's Registration and Licensing Board!
http://www.crb.ri.gov/licensedetail.php?link=42964&type=Comme

1600 Division Rd West Warwick, RI. total SQ FT 53,242 SF. The Company entered into a lease in February 2019 for the rental of a 48,167 square foot space in Rhode Island to be used for the Company’s MedRecycler operations. They sign 10 years agreement plus 10 years option to renew. Note: Company lease the entire building except the front brick building.

https://www.loopnet.com/Listing/1600-Division-Rd-West-Warwick-RI/14082654



CHECK THE COMPANY TWITTER https://twitter.com/SunPacificPower show the building is match with my research above.





$20M state of the art 50k SF waste to energy recycling power plant processing 70 ton per day of medical waste and generate 1.8 MW is nearing its completion

Power generation engines that will be producing 4.8MW at full capacity ready with our red and blue colors


a lot of the equipment has arrived...




Pictures from their Medical Recycling facility, about 20 million dollars facility













Watch this video: Inner lining for our waste to energy system. Look at the facility 48,167 SQ FT... HUGE boiler Blue color in the front...

https://www.instagram.com/p/Bz-j8b_nL3L/?igshid=65wgi8aagqw4

New roof delivered for installation at our facility



2500 sq ft office ALMOST COMPLETED! This might be the last stage before they launch…GRAND OPENING...





Sconi13

11/11/19 12:24 PM

#18078 RE: chipreznick #18060

Agreed no way they start up a plant like that in 3 months. I'm not a basher I'm buying. My best guess If they continue strong start up 6/2020. By then this will be at .05. Just my opinion. Love all the DD