InvestorsHub Logo
icon url

Paradox

10/02/03 4:41 PM

#15 RE: mr sharetrader #14

Mr Sharetrader, I don't know the answer to the ongoing pressure requirements, the first recovery well is being drilled in parallel with fracture stimulation.
I suppose the second recovery well will be drilled if the fracture stimulation is successful, the flow rates are acceptable, and they decide to proceed with the pilot plant

.... Paradox