Mr Sharetrader, I don't know the answer to the ongoing pressure requirements, the first recovery well is being drilled in parallel with fracture stimulation.
I suppose the second recovery well will be drilled if the fracture stimulation is successful, the flow rates are acceptable, and they decide to proceed with the pilot plant
.... Paradox