#10315 RE: Jack_Bolander #10307

So, if they do a 15 MW installation comprised of six units, they can't run the six units separately? LIPA 7.4 MW is going to be dispatched by the utility, they can't dispatch the 3 or 4 separate units separately?

Drgdarf

05/19/19 3:25 PM

#10532 RE: Jack_Bolander #10307

hmm. but there is a patent to allow them to do this.

Drgdarf

05/19/19 3:34 PM

#10534 RE: Jack_Bolander #10307

"Fuel cell load cycling to support the electric grid"

the name of an FCEL PATENT. EU patent: EP3465809A1