InvestorsHub Logo

microcaps1

04/08/19 2:30 AM

#31565 RE: microcaps1 #31564

so .5M design and 1/2 of acquisition costs in escrow acct-probably at time of signing of 3d survey contract -are costs of survey by apr 30

plus possibly portions of a couple of the other costs -

and for that would have to go back to the 10k to see the timeline of these various aspects of the survey-which i have posted several times before-anybody care to do the honors this time?