so .5M design and 1/2 of acquisition costs in escrow acct-probably at time of signing of 3d survey contract -are costs of survey by apr 30
plus possibly portions of a couple of the other costs -
and for that would have to go back to the 10k to see the timeline of these various aspects of the survey-which i have posted several times before-anybody care to do the honors this time?