InvestorsHub Logo
icon url

Mr. W

08/04/18 8:12 PM

#24280 RE: tothe #24279

One thought. If they CAN'T reuse it, maybe they could order it asap when they start the next drill, and it will arrive by the time we need it as far as penetration down farther?
icon url

KyOil

08/05/18 8:29 PM

#24487 RE: tothe #24279

The BOP that was replaced due to high pressure could be used on a shallow well, but not a well with the lower Jurasic or Triassic as a target.

If they don't have plans for a shallow well, then I guess it will be sold.