Speech by Wang Tiancheng, General Manager of Jinzhong New Energy
On July 27th, Henan Province, Anyang City High-tech Zone Jinzhong New Energy Technology Co., Ltd. "Zhongyu Mingyang Anyang Charged and Replacement Power Station" project construction site, "Jinzhong New Energy" CEO Wang Tiancheng (middle) and engineering and technical personnel are looking forward to the future of the project .
I think in one photo WANG is referred to as the Boss. Your arguments are weakening as the time goes past. In another he is the Director of Operations. My car is also mistakenly referred to here in the United States as an automobile even though I have to drive it in manual gear to make it move me from place to place. Better stock up before the bell rings because it will be ringing very loudly.