Eight head assay samples were taken averaging 1 g/t Au and 50 g/t Ag with one sample showing 30 g/t Au and another sample with 800 g/t Ag.
Any math wizzes out there? Assuming the eight head samples fairly represented the material loaded into the VAT, how do you average 1 g/ton Au, with one sample at 30 g/t? At a minimum, the 8 samples would average 3.75 g/ton, even if the other seven samples were zeros.
Aside from the curious math, why are they trying to VAT leach partially oxidized material averaging only a g/ton?