InvestorsHub Logo
icon url

gitreal

07/18/18 4:07 PM

#26116 RE: EightRealtor #26115

From June 2nd PR:

Mexus completed its first test of the VAT leaching system and the Merrill Crowe gold recovery plant at the 8 brothers/370 mine project. The successful test produced 70 pounds of precipitate which is currently being dried and prepared for smelting. Results of this first run will be released soon. The material initially mined took longer to leach than expected. Mexus geologist, Cesar Lemas, has identified new material which has been column tested showing a 48 to 72 hour leach time. The company will mine and use this material going forward to accelerate recovery times.



It's been two weeks. That precipitate sure is slow to dry.
icon url

F4Uvet

07/18/18 9:57 PM

#26120 RE: EightRealtor #26115

Keep in mind (1) there must be enough gold to warrant pursuing the smelting process (2) news of results will be dispensed in accordance with the following per MXSG board spokesperson.

"Vat residue smelting ( if any ) does seem possible after 2nd so gets a PR (when seen needed) due time.

There is more money to be made charging tourists .25 each to tour faux gold mine and replica stamp mill in Virginia City, Nv