I've been thinking about that too but decided I was wrong on that front, because who is to say without the extra time spent with Nordmin that the mine would have happened sooner?
Would it have? Definitely not! imo And if it did happen sooner, would we be better off? (best deal)
I do not think we'll see a FS redo. That would be both costly and time consuming. Multiple independent parties would need to sign off on a new FS. I think potential financing entities will do their own due diligence using the FS as a starting point and consider potential impact of design changes such as handling water differently and economic assumptions about the pricing and future of all three technology metals we plan to produce. All JMO.