I recall reading in a previous release that the two existing venues are running at capacity with 125 rigs. Therefore, unless I'm missing something glaring, any additional purchased rigs would not be "online" until the new location is up and running.
"The total number of installed mining rigs had reached 125. This number is directly related to the availability of the electric power, which is currently at maximum utilization capacity at both locations."