InvestorsHub Logo

fsulevine

01/17/18 1:42 PM

#5095 RE: Hoghead7 #5091

I just e-mailed investor relations on this. I'll let everyone know if I get a reply. On their on-line form, for "Company" (which is a mandatory field to be filled out), I simply put "Private Investor/Stockholder". We'll see if I get an answer.

Jack_Bolander

01/18/18 10:37 AM

#5111 RE: Hoghead7 #5091

UH OH..Canadian Oil Sands !!!

I hate to break this to you, but the Canadian Oil Sands is merely a STUDY and NOT A PROJECT.

Also, NEITHER EXXON nor Imperial are involved.

"The study will focus on how a fuel cell power plant can separate and capture CO2 from both the Husky Steam Assisted Gravity Drainage (SAGD) heavy oil thermal facility and the Scotford bitumen upgrading facility, where bitumen extracted from the oil sands is converted into synthetic crude oil. The fuel cell carbon capture solution efficiently concentrates the CO2 from the facility’s extraction process as a side reaction to fuel cell power generation and this ability to produce power while simultaneously capturing CO2 is the critical differentiator compared to conventional capture technologies. The study will determine how a megawatt-scale FuelCell Energy power plant operating on natural gas can affordably capture up to 43 tons of CO2 per day as well as destroy approximately 70 percent of the nitrogen oxide (NOx) in the flue gas routed to the fuel cell from the bitumen upgraders. These upgraders convert heavy oil (bitumen) into synthetic crude oil. "