InvestorsHub Logo

Magnum7419

01/07/18 9:39 AM

#144572 RE: JLHammer #144569

$BVTK Here are some specs from the RFP for "The Wall"

b) Technical Data Rights: The Contractor shall not use, disclose, reproduce, or otherwise divulge or transfuse to any persons any technical information or data licensed for use by the Government that bears any type of restrictive or proprietary legend except as may be necessary in the performance of the contract.

https://www.fbo.gov/index?s=opportunity&mode=form&tab=core&id=c0cce0b2ef8d297b22dc251ea14c60d1&_cview=0


"CBP anticipates awarding IDIQ contracts to multiple Contractors. All selected Contractors will be awarded one (1) task order to construct its proposed prototype. All selected Contractors may also be provided an opportunity to propose on future task order requirements that are anticipated to be both design build and design bid build task orders for border wall and supporting tactical infrastructure and technology along the southwest border. Tactical infrastructure includes: access and patrol roads, fencing, drainage structures, motorized vehicle gates, light-emitting diode (LED) lighting, fiber optics and communication towers. Technology could include remote video surveillance systems (RVSS), ground sensors, etc."

p) Telecommunications Towers. Towers ranging from 80 feet to several hundred feet used
by CBP to provide tactical communications for Border Patrol command and control
and safety. Towers shall include a shelter for equipment as well as a power supply, in some cases requiring solar power where electrical service is not available

spotonge

01/07/18 2:40 PM

#144609 RE: JLHammer #144569

In speaking that is very low isn't?

angeloh

01/07/18 4:39 PM

#144653 RE: JLHammer #144569

O/S is 14 mill...
Gone on an early morning of trading BVTK...
Current OS = 0..?