Just the 500 is in the pad 2 increased assay not yet under leach. Give that 30 days from switch over if set up goes better than MC silt pollution not such consideration. Start up difficulty is always in the git go till it gits goin. San Felix will NOT use electrowin with a built plant and known ore composition to leach many years. It did try floating an old distant mine waste Ken felt was ok but proved waste of time worthless. NOW THERE was #10 scammer but we DID put in jail knowing what we were doing all along. THE DUMB GRINGO RICH GUYS,eh, PD? (takes yes no so use the ?)8