"Construction of a new 1,000 MW unit, known as Ostroleka C, had been expected to start in 2013 with
commissioning scheduled in 2015. Coal would be supplied by coal from the Bogdanka coal mine.[2]
http://ir.cleancoaltechnologiesinc.com/press-releases/detail/76/clean-coal-technologies-announces-milestone-epc-contract

In September 2012 ENERGA S.A. announced that it had suspended plans to build the new plant due to problems securing financing. The company said that it would continue looking for a strategic partner but failure to secure one would mean freezing the project until more beneficial market conditions prevail.
http://ir.cleancoaltechnologiesinc.com/press-releases/detail/35/clean-coal-technologies-moves-to-dissolve-good-coal-joint

In October 2012 Energa said it was considering switching from coal-fired generation to using gas as a feedstock fuel for the shelved unit, and may also reduce the unit’s proposed capacity by more than half to 450 MW.[3]. "

((Similar to Kemper)) -bluf-
https://www.bloomberg.com/news/articles/2017-06-28/southern-stops-work-on-the-coal-part-of-clean-coal-power-plant

"During a visit to Ostroleka in October 2015, the president of the Law and Justice party declared the government will return to the exploration of coal mines for Polish energy independence, and will revive plans for the Ostroleka coal plant.[4]
http://ir.cleancoaltechnologiesinc.com/press-releases/detail/103/clean-coal-technologies-inc-signs-binding-term-sheet-to

In November 2015 it was reported that Energa and Enea are considering cooperating in the construction of the new unit at Ostroleka. However, talks are at a very preliminary stage.[5]
http://ir.cleancoaltechnologiesinc.com/press-releases/detail/98/clean-coal-technologies-inc-in-advanced-negotiations-for

In September 2016 Energa and Enea signed a letter of intention regarding development of a 1,000 MW coal plant in Ostroleka. They say permits for the plant are still valid, and the companies plan to call for tenders before end-2016 to begin construction. The planned completion date is 2023.[6]
http://ir.cleancoaltechnologiesinc.com/press-releases/detail/119/clean-coal-technologies-inc-signs-binding-letter-of

In December 2016 Energa and Enea began planning to invite bids to build the plant. It is planned for 2024.[7]"
http://ir.cleancoaltechnologiesinc.com/press-releases/detail/121/with-soaring-coal-prices-ccti-evaluates-counter-

Here's the link to the original. I think you'll see where Pristine-SA gets its name.. That must have been what the DOE was up recently. Looks like we passed :)

As with all of my posts. I suggest doing your own DD.
http://www.sourcewatch.org/index.php/Ostroleka_power_station


Sponsor: ENERGA S.A., Enea
Parent company: ENERGA Elektrownie Ostroleka S.A., Enea
Developer:
Location: Ostroleka, Masovian, Poland
Coordinates: 53.103611, 21.6125 (exact)
Status: Permitted
Capacity: 1000 MW
Type:
Start date: 2024
Coal Type: Hard coal/biomass
Coal Source: Bogdanka coal mine
Source of financing: