#33463 RE: CPTMatt #33462

Re GWA I think they will be to the target resource at that time, with hopefully some good surprises along the way. Part of the delay was building out the infrastructure-tailings area to support commercial production as opposed to setting up for just the bulk sample. Since commercial production is their mission, this will help later. Hopefully you checked out the infrastructure buildout in the video.




Heres a couple possible catalysts from the PR:
The run of mine (ROM) ore will first be crushed and sent through a Dual Energy X-ray Transmission (DEXRT) ore sorting unit supplied by Steinert US, which is to be used to sharply reduce handling costs and increase gold grades of ore sent for processing. Per the Pre Feas report, the ore sorter actually worked much better than the doubling of the head grade that they reported.

Ongoing definition drilling continues to identify promising zones above areas previously defined in the Pre-Feasibility Study*.