Support: 888-992-3836
Copyright © 2023 InvestorsHub Inc.
Replies to post #3757 on Mining Company research board
deadjim
12/23/16 3:06 PM
#3759 RE: gitreal #3757
Mexus currently has an open pit heap leach permit #DG-SG-UGA-1A1019-. DIC-13-2013 at the Santa Elena property. Work on a 10,000 ton cyanide heap leach test pad has begun which Director of Operations (DOO) for Mexus, Cesar Lemas , believes could produce 2 grams per ton of gold. In addition to this test pad, DOO Lemas will also handle the mining of the high grade quartz veins. This material will be run through Mexus’ gravity ball mill which is already in place at the property. The high grade material has been shown to average 31 grams per ton.
bobbyinredwood
#3760 RE: gitreal #3757