InvestorsHub Logo

Rat Fink

12/09/16 10:06 PM

#251489 RE: 1vman #251438

WHOOPS!!! CONSTRUCTION WORKERS,_VEHICLES,_EQUIPMENT_WOULD_ENTER THROUGH 2 LARGE BAY DOORS ON "BACKSIDE" OF WAREHOUSE AND NOT THRU "FRONT" DOORS!! CONSTRUCTION VEHICLES AND EQUIPMENT CAN'T FIT THROUGH THE "PERSONNEL" DOORS IN "FRONT" OF THE BUILDING!!!

ERBB HAS BEEN SAYING ALL ALONG THAT THEY ARE "BUILDING_OUT THE INSIDE" OF AN "EXISTING" 12,000 SQ. FT. BUILDING TO BECOME AN MJ CULTIVATION FACILITY!!! THAT MEANS THEY ARE "RENOVATING" THE "INSIDE" OF THE "EXISTING" BUILDING. THEY NEVER SAID THEY ARE MODIFYING THE "EXTERNAL" STRUCTURE OF THE WAREHOUSE!!!

BELOW IS A PHOTO THAT AG POSTED ON MAY 12TH ON THEIR TWITTER SITE: https://twitter.com/American__Green PHOTO CLEARLY SHOWS 2 LARGE BAY DOORS. CONSTRUCTION VEHICLES, EQUIPMENT, ETC. CAN EASILY FIT THROUGH THESE 2 BAY DOORS. CONSTRUCTION VEHICLES/TRUCKS WOULD PARK ON THE "BACKSIDE" OF THE BUILDING NEAR THE 2 LARGE BAY DOORS OR EVEN "INSIDE" THE WAREHOUSE; NOT IN FRONT!!!


BELOW IS QUOTE FROM POST 251438.

Doors to building are closed ,with daily construction they would be open

Debris from demolition would be evident on the outside

Contractors would start on the outside first not the inside
















garyhalvo

12/10/16 1:40 PM

#251503 RE: 1vman #251438

First-stage interior demolition is expected to take 3 to 4 weeks followed by a buildout of the facility

Rat Fink

12/12/16 10:18 AM

#251537 RE: 1vman #251438

WHOOPS!!! CONSTRUCTION WORKERS,_VEHICLES,_EQUIPMENT_WOULD_ENTER THROUGH 2 LARGE BAY DOORS ON "BACKSIDE" OF WAREHOUSE AND NOT THRU "FRONT" DOORS!! CONSTRUCTION VEHICLES AND EQUIPMENT CAN'T FIT THROUGH THE "PERSONNEL" DOORS IN "FRONT" OF THE BUILDING!!!

ERBB HAS BEEN SAYING ALL ALONG THAT THEY ARE "BUILDING_OUT THE INSIDE" OF AN "EXISTING" 12,000 SQ. FT. BUILDING TO BECOME AN MJ CULTIVATION FACILITY!!! THAT MEANS THEY ARE "RENOVATING" THE "INSIDE" OF THE "EXISTING" BUILDING. THEY NEVER SAID THEY ARE MODIFYING THE "EXTERNAL" STRUCTURE OF THE WAREHOUSE!!!

BELOW IS A PHOTO THAT AG POSTED ON MAY 12TH ON THEIR TWITTER SITE: https://twitter.com/American__Green PHOTO CLEARLY SHOWS 2 LARGE BAY DOORS. CONSTRUCTION VEHICLES, EQUIPMENT, ETC. CAN EASILY FIT THROUGH THESE 2 BAY DOORS. CONSTRUCTION VEHICLES/TRUCKS WOULD PARK ON THE "BACKSIDE" OF THE BUILDING NEAR THE 2 LARGE BAY DOORS OR EVEN "INSIDE" THE WAREHOUSE; NOT IN FRONT!!!


BELOW IS QUOTE FROM POST 251438.

Doors to building are closed ,with daily construction they would be open

Debris from demolition would be evident on the outside

Contractors would start on the outside first not the inside