#110940 RE: anunnaki #110930

TAXI Most of the time they park at station waiting for clients near to their wait station. They can charging while they wait.

a Level 2 station could charge that 16 kWh battery in about 2.5 hours, but this is where things get a little tricky. As it turns out, the station is just the energy supplier in the charging world—the actual device that regulates charging speed is on-board the car. And, as it also turns out, this on-board charger is the absolute critical piece to understanding how fast you can charge your brand spanking new electric car.

If you wanted to take maximum advantage of your typical Level 2 station, you'd want an on-board charger that could handle at least 6.5 kW. Today, things are quite a bit different though. The first gen LEAF is shipping with a 3.3 kW charger, same as the first gen Volt. The Coda Sedan, however, is shipping with a 6.6 kW charger.

So even if your Level 2 station is rated at 6.5 or 6.6 kW, if you have a LEAF or Volt, you'll never be able to push more than 3.3 kW to the battery at any given time—resulting in charging speeds that are half that of what you might expect based on the charging station's

The majority of public stations are Level 2 chargers. You find them in special electric-vehicle parking spots in garages and other facilities. The Plugshare Web site shows an extensive list of charging station locations throughout the country.