InvestorsHub Logo

deesil

02/19/16 9:13 AM

#26546 RE: KC01905 #26544

The AOT is installed at pump stations. Each pipeline will be different with regard to how many stations, distance between stations, length and diameter of pipe, type of material being transported, the client's goals, and probably two dozen other factors about which us laypeople know nothing.

All of those variables are what the QSEP + Temple team analyze in the "Pipeline Optimization Program." That analysis culminates in a report that predicts the likely benefit a particular client can derive by installing AOT on its unique line.

The Program is extremely customized to every client that wishes to undergo the process. As a sales tool, the Program is indispensable. It and the value-added modifications to the AOT have been a painfully long time coming. The optimization process has led to a more efficient and more effective AOT.

I have a feeling the ROI numbers the Program is producing are grabbing the attention of operators all over the world...