Shea's claim of $5m a year net profit is actually preposterous, at this early stage, as no feasibility study has been done. Further, permitting costs will prove to be far more costly that he has projected, and then the infrastructure costs are a factor to be considered. Even for a heap leach operation, the costs are going to be significant.

Last, one should be aware of the time frame from being at the current stage until production commences. Typically, this is 5-15 years. Shea's projection of two-three years is a pipe dream, sorry to say.

MOMO

11/02/15 11:40 AM

#11916 RE: vantillian #11913

and that is a low ball number imo

Slojab

11/02/15 12:43 PM

#11933 RE: vantillian #11913

Ahhhhh projections. Ya gotta love 'em.