I believe they are talking about our Deform. There was a Honeywell presentation out there that showed the "IPQA" implemented right into the ICME framework. Can someone find that and repost it?
not sure if this is what you are looking for..cannot find the link but can post some of the info... DARPA Open Manufacturing Rapid Low Cost Additive Manufacturing Jim Neumann, Honeywell PM Don Godfrey (Task 2), Pete Kantzos (Task 1), Dr. Alonso Peralta (Task3), Honeywell PIs
Title: Rapid Low Cost Additive Manufacturing Schedule: 24 Months Scope: A 24 month effort to develop an integrated computational material engineering (ICME) framework to accurately predict the material properties of components produced using Direct Metal Laser Sintering (DMLS). The ICME framework will use DMLS machine parameters to ensure optimization of design, process, material and performance prior to component fabrication. • Task 1: Design for Manufacturability Analysis, Synthesis and Manufacturing Process Selection Tool Task • Task 2: Rapid Manufacturing Processes, Process Controls, Process Models and Simulations • Task 3: Rapid Qualification Approaches In Process Quality Assurance (IPQA): Real Time NDE (B6Sigma) • Optical pyrometers and thermal imaging will be used to quantify thermal history. – Correlate Voice Of the Process (VOP) response to DMLS process parameters – Correlate VOP to possible defect structures – Use VOP data to validate and calibrate process models • ULTIMATE GOAL: On-machine acceptance and qualification of components – Acceptable process algorithms based on POD curves for all defect structures IPQA Data Will Be Used to Calibrate and Validate Models
Planned Accomplishments • Demonstration of DMLS process parameters to fabricate IN718Plus (Tensile/YS focus) • Verified and Validated ICME system model • Process model • Structure model • Property model • Demonstration of IPQA capability • Probabilistic Based Rapid Qualification Frame Work • Identification Of Technology Gaps (Lessons Learned) • Honeywell Expects A Dramatic Reduction Qualification Timeline & Costs