InvestorsHub Logo
icon url

BeachBum

07/31/15 5:05 PM

#20055 RE: lobo13 #20053

New ceiling tiles were put in before the floor was stained weeks ago. They had caution tape around perimeter while drying. Only a few cutouts are left around ceiling fans and sprinklers. Tiles stacked in the entry and the service area are the removed. Ten minutes tops to discard. I don't believe there is a dumpster on site yet. Once booths/seating and lighting are in, they can clean, stock and fire it up imo. Inspections and permits allowing of course.
icon url

bigd5

07/31/15 7:49 PM

#20056 RE: lobo13 #20053

Not in the big room on the west side