Dynamis Energy and All Way Sign Agreement to Construct Waste-to-Energy Plant in Lombardy, Italy July, 2013 EAGLE, Idaho – Dynamis Energy (www.dynamisenergy.com)and All Way (www.allway.it) have entered into a Joint Venture for the construction and management of a Waste-to-Energy plant based on the Dynamis 3.0 Advanced Thermal Gasification Technology. Under the agreement, All Way and Dynamis Energy will design and build the Waste-to-Energy plant in Lombardy, Italy. The plant will be integrated into an existing waste management facility and will process post-sorted municipal solid waste to generate steam and electricity.
All permits for the Waste-to-Energy plant have been secured and engineering for the plant has begun. The actual construction phase of the Waste-to-Energy plant will take approximately 10 months and is anticipated to begin in August of 2011. Actual start up and operation of the plant is anticipated to be in the late summer or early fall of 2012.
This was the last ever reported about it and All Way seems to be out of business. Another Dynamis promise left unkept. Anyone that can correct this conclusion, please help me out with the information. Otherwise start adding up how many shares of fsnr will be needed to compensate Dynamis for their "Design and Build" contribution to this masterful enterprise.