InvestorsHub Logo

r0und3r

01/29/15 1:54 PM

#29769 RE: BRoubos #29766

Thanks BR. Although the GE ramp begins and 2015 and have stated that they will equip the factory in early 2015 with a big production ramp through 2015-16 and full to follow. I would venture to guess that PR3D will be needed sooner than later as soon as production begins. Aerospace = quality is EVERYTHING. Especially with GE. I have worked with them and they are the toughest when it comes to quality control documentation.