InvestorsHub Logo

oilsleuth

12/05/14 4:28 PM

#38765 RE: crazyjogger925 #38743

The seismic survey planned for 2012 ws not carried out and the expenditure reported by Mal on ground geophysics was fraudulent.

The second link is about seismic surveying that was carried out on the SEL prior to the later EL which no one is disputing was performed.

So much time is spent on this board refuting red herring posts that have no real relevance.

Drunken Sailor

12/05/14 6:39 PM

#38785 RE: crazyjogger925 #38743

There was no seismic work in the Smart Win budget. Those are old invoices and irrelevant. Smart Win wanted proof EEGC had settled the invoices they said they had and they sent a load of old invoices to confuse the situation