The addition was built in 2011/2012 - that would be 2 - 2-1/2 years ago. This picture was taken right after that, BEFORE they installed the additional storage tanks and containment beds.
The photos I posted were taken within the last two weeks.
I don't know why anyone would find them surprising. JBI Inc. reported in their last SEC filing that they don't have the $200K needed to fix the processors.
It's not is if JBI can afford to have employees.
Perhaps if Bordynuik took a slight pay cut, they could afford to pay a security guard minimum wage to keep watch over their billion dollar technology when nobody is around.