InvestorsHub Logo

vuduu

09/12/14 3:00 PM

#10519 RE: Adrock #10516

ok. here is some more:

go to page 22 of the 43-101. you will see LS08-5. this is the drill hole that matches up with the post by jwage. the next two numbers are the thickness of the drill hole from XX to XX. then the Au_g/t is gold per gram, the Cu% is copper % per ton, and the Ag_g/t is the silver per gram.


now, .3 of gold is generally considered commercially viable for mining. reading the results, the gold is reading at .6 or above. that alone is more than 2x the viability. here is the kicker; these drill holes also have copper and silver in the same drill hole. this means that we are getting copper and silver on top of the gold viability. given that we are likely to do surface mining (low cost mining), these results are HUGE!!!!!!