o you realize the reduction in the drilling program? I dont think that JB will mind me using his words, well i am assuming.
quote from post #187. This will decrease our surface drill sites to 41 drill sites, a decrease of 89% by drilling from the central mother hole.
so if we drill 89% less what is that in drill holes and footage reduction, as opposed to the given 89% represents a cost annalysis savings, which also relates to arriving at a much earlier date for the release of news regarding the results, in fact 89% sooner. The present Phase#1 is rated at what 6 million USD cost! What 89% reduction in labor expenditure, 89% reduction in retooling changovers, 89% reduction in transportation moves (hole to hole shifts), 89% ANON for every asspect in overall means to an end, not to mention that the MICROSOFT MINING adaptation should also add massive amounts of time savings efficiencies.