InvestorsHub Logo

Mick Dodge

08/08/14 9:14 AM

#6924 RE: Mick Dodge #6923

Compensated Awareness Post View Disclaimer
All of our operations are directed to have mine closure plans and mine closure cost estimates in place. Returning land disturbed by mining to stable and productive post-mining land uses is a cornerstone of our commitment to responsible environmental stewardship. At CTGX, reclamation planning begins “before” construction and is regularly updated throughout the life of each mining operation. During the life of each mine, reclamation test plots as well as engineering and environmental studies assist in verifying and optimizing reclamation strategies and plans. Every effort is to be made to reclaim land that is no longer required for operations while mining operation are still active. CHCX