We are right there in the middle of it. Downstream we have several blocks of gravels in the actual Big Bend itself. Upstream we have a mile of gravels throughout the entire length of the channel.
You can see where we came into the channel. From the Big Bend access extension tunnel, the one Brush Creek built for us before the POG collapsed to $250.00/oz in 1998.
Our new raise goes from that tunnel up under pink block D and into the channel next to pink block D near pink block E. Block D has almost 5000 tons of gravel and could hold over 1000 ounces of gold. This would take a few months to mine at full capacity.
Whichever direction, upstream or downstream, has more gold I would guess NBRI would head that direction initially. Then they could mine both sides of the raise to increase production.