InvestorsHub Logo
Followers 9
Posts 399
Boards Moderated 0
Alias Born 09/23/2013

Re: loanranger post# 86214

Sunday, 03/30/2014 4:03:06 PM

Sunday, March 30, 2014 4:03:06 PM

Post# of 146301
I don't know the exact answer to that. However, it seems to me to be in the best interests of NNVC to take on the responsibility with TC support.

In addition to FluCide cGMP requirements, NNVC will dictate the timeframes and number of R&D projects that will also be conducted in separate suites of the new facilities. That wouldn't be something TC could or should do. But I am sure that TC would have to have been called in to provide the technical details on the number of unit operations, the size of the vats, the hookups required for the process parameters, any additional environmental control requirements, etc.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent NNVC News