another note with all of the wells that peii owns it would probably be feasible to say that at least 2/3 wells would be needing to be worked over.

It would be a good field for rig and crew to get into because they would have steady and contiuous work and as i said before a typical pump change and tubing inspection/run on would take around a day to do. so no need for the well to be out of production for too long so long as their is a rig in the area full time.