Drilling at 50 ft per hour, TD possible in 5 days.
By: rruffintx (RB AMEP board)
10 Feb 2006, 08:15 AM EST
Msg. 61122 of 61151
Jump to msg. #
Drilling rig:
Rig is drilling at 1300' at about 50 fph. Things are going a little smoother. With any luck we should reach TD in the well in 5 days and run casing after completing an open hole log to determine production zones and correct depths.

rruffintx, thanks for the update.
... hawk