J3...not bad for their first 10 months in business:

News/Announcements

January 3, 2014 – Pacific Northwest National Laboratory (pnnl.gov), a Department of Energy’s national laboratory, requested J3 partner on a presentation highlighting critical capabilities in environmental remediation, compliance, and monitoring that are necessary for remediation of abandon mines. The presentation will be delivered to the Federal Facility Cleanup Committee by PNNL and J3 during the first quarter of 2014 in Washington, DC.

December 2013 – MBS Team requests Oak Ridge soil samples for landfill experiments (Oak Ridge Mercury Timeline)

11-2013 – White Shield, Inc.
A Non-Disclosure and Teaming agreement is in place with White Shield, Inc. a Native American company (www.whiteshield.com).

11-1-2013 – New Vice President.
Jim Fallacaro, President, has named R. Chip Johnson as the Vice President of Corporate Finance for J3 as of November 1st.

10-2013 – S.M Stoller Corp.
J3 Non-Disclosure Agreement in place with S. M. Stoller Corp (www.stoller.com).

9-20-13 – Garnet Mine Dust Collection Retrofit
J3 signed a contract with Garnet USA for the retrofit of Garnet’s dust collection system at their mine located in Alder, Montana. ... additional information

9-17-13 – Contaminated Chrome Soil Treatability
J3 was able to successfully treat soil to non-detect levels and is currently working with the company on the advancement of the soil treatment.

8-2013 – J3 Non-Disclosure Agreement in place with General Electric Infrastructure - Water & Process Technologies (www.gewater.com).

8-22-13 – Lead Slag Treatment
Lead slag samples were successfully treated to below the RCRA regulatory limit using a 5 wt% MBS application.

8-7-13 – Idaho Mine Water Treatment
Water collected by U.S. Bureau of Land Management (BLM) (http://www.blm.gov/wo/st/en.html) personnel from a mine adit in Idaho was successfully treated using MBS in quantities ranging from 5.55 g/L to 6.35 g/L. ... additional information

6-4-13 – Sorbent Certification Testing
J3 signed a contract with M2 Polymer in June 2013 to perform certification testing for their Waste Lock 770 sorbent roll material and for their tea bag sorbent socks. ... additional information

5-7-13 – Montana Mine Water Treatment
J3 treated water from a mine in Montana collected by Tetra Tech (http://www.tetratech.com/) personnel and treated the sample with MBS in quantities ranging from 1.05 g/L to 1.5 g/L.

"Despise the enemy strategically, but take him seriously tactically."