Cambalache Project Highlights

Currently in production from one level with a second in development

Project is generating revenue

Three identified low sulfidation veins with demonstrated dimensions:

Widths: 0.5 m – 10 m

Lengths: 500 m

Heights: 250 m


Reported grades:

Lead (Pb): 11%/ ton

Silver (Ag): 15 oz/ ton

Varying levels of Zinc (Zn) and Copper (Cu) as potential products



Reported high grade Silver (Ag) ore shoot was developed at depth. In the late 1980’s, direct shipping ores were produced (200 oz – 500 oz/ ton; (*to be confirmed).


Project has mining, environmental, social, and plant permits