Tuesday, March 05, 2013 8:36:57 AM
Petro One Energy Corp. (TSX VENTURE:POP)(PINKSHEETS:CUDBF)(FRANKFURT:C6K1) is
pleased to report that the Frobisher well recently drilled by its farmout
partner at Bromhead, Saskatchewan averaged 107 bopd and produced 5,883 barrels
of light oil during its first 1320 hours (55 days) of production.
"Based on the excellent oil volumes recorded thus far, this new well should
substantially increase Petro One's cash flow and daily oil production, and add
significantly to the Company's reserve base," said Petro One President Peter
Bryant. "Petro One is encouraged by the prolific, long term production that has
been demonstrated by producers in the immediate area in the Frobisher. We look
forward to the potential development of the remaining sections of the 100%
controlled J10 property."
As a result of drilling and completing the Bromhead well, as discussed in the
Company's January 21, 2013 news release, the farmee has earned a 100% working
interest in the Bromhead well spacing unit (2 LSDs - 80 acres) subject to a 10%
GORR that Petro One has the option to convert to a 30% working interest
following payout. Another prime horizontal development drilling location is
indicated on the two earned LSDs west of the discovery well. If the farmee
drills this location in future, Petro One will benefit from the same 10% GORR
or, if it has exercised its conversion option, be entitled to a 30% working
interest. The farmee has elected not to exercise its continuing option on other
Petro One land at J10 at this time, so Petro One retains its 100% interest in
the remaining 87.5% of the Bromhead property (14 LSDs - 560 acres). The
Company's geological team is of the view that the correlation between seismic
tests, other data and the strong results of the first well indicate that
multiple prime drilling locations remain on the 100% controlled Petro One land.
The new Bromhead well is producing oil from the Frobisher Beds, a porous
limestone unit that is widespread in southeast Saskatchewan. The Frobisher is
being extensively developed with horizontal drilling in many areas, resulting in
long-lived production at good rates. Limited Frobisher drilling has been done in
the J10 area to date, but a former vertical Frobisher producer 220 metres
downdip from the property yielded more than 100,000 bbl of oil from the
Frobisher with a one month IP of 95.6 bopd, as well as more than 407,000 bbl of
oil from the overlying Midale Beds, with a one month IP of 146 bopd. The oil in
this former producer is light, with an API gravity of 28.1.
Petro One looks forward to releasing the three month IP rates, and updated
reserve status as soon as they become available.
NATIONAL INSTRUMENT 51-101 DISCLOSURE
Oil production during a period is generally expressed in terms of "barrels per
day" or "BOPD", which indicates the total oil produced during a period divided
by the number of hours that the well was in production during that period.
"Barrels per day" is indicative of flow rate while a well is in production and
does not mean that such well was in constant production during such period.
ON BEHALF OF THE BOARD
Peter Bryant, President & Director
For further information, please visit the company's website at
PetroOneEnergy.com and follow the Company's tweets at
Twitter.com/PetroOneEnergy.
FOR FURTHER INFORMATION PLEASE CONTACT:
King James Capital Corporation
Jeff Stuart
Investor Relations
(604) 805 0375
jstuart@kingjamescapital.com
NanoViricides Reports that the Phase I NV-387 Clinical Trial is Completed Successfully and Data Lock is Expected Soon • NNVC • May 2, 2024 10:07 AM
ILUS Files Form 10-K and Provides Shareholder Update • ILUS • May 2, 2024 8:52 AM
Avant Technologies Names New CEO Following Acquisition of Healthcare Technology and Data Integration Firm • AVAI • May 2, 2024 8:00 AM
Bantec Engaged in a Letter of Intent to Acquire a Small New Jersey Based Manufacturing Company • BANT • May 1, 2024 10:00 AM
Cannabix Technologies to Deliver Breath Logix Alcohol Screening Device to Australia • BLO • Apr 30, 2024 8:53 AM
Hydromer, Inc. Reports Preliminary Unaudited Financial Results for First Quarter 2024 • HYDI • Apr 29, 2024 9:10 AM