Well Mesa Energy did not complete the first well in the ML in Oklahoma,this is a set back, but look at it this way, the vertical well did not cost them over 1 million dollars to drill because they never did drill the 4,000 ft lateral or test it or put in the casing. so that is a positive.Early in the drilling process they ran into problems so I dont know how deep they drilled they did not say. so their costs were not not that great.